I-5 Tumwater Washington Accident Reports
More results in our I-5 Tumwater Washington Archives
DOT Accident and Construction Reports
-
Road ClosedUS 101 at Tumwater Creek closed on Monday, March 3. The closure will last 80 days. The roa
TYPE: Construction Serious
-
Road ClosedUS 101 at Tumwater Creek closed on Monday, March 3. The closure will last 80 days. Travele
TYPE: Construction Serious
I-5 Washington Accident Reports Statewide (18 DOT and News Reports)