I-94 President Heights Wisconsin Accident Reports
More results in our I-94 President Heights Wisconsin Archives
DOT Accident and Construction Reports
-
TYPE: Accident Serious
-
TYPE: Accident Serious
-
TYPE: Accident Serious
-
Road ClosedW Allerton Ave Road is closed at S 76th St.
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Accident Serious
-
Road ClosedRoadwork - Local Road Full Closure on - SB from 48th Street to Greenfield Avenue. From 07:
TYPE: Construction Moderate
-
Road ClosedRoadwork - Local Road Full Closure on - WB from Miller Park Way to 56th Street. From 07:00
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
Road ClosedRoadwork - Local Road Full Closure on - WB from S 92nd St to S 76th St. From 12:00 AM on 0
TYPE: Construction Moderate
-
TYPE: Accident Serious
-
Road ClosedConstruction - Mainline Right Lane Closed from OFF RAMP TO 94 WB CONNECTOR to PROSPECT DR
TYPE: Construction Serious
-
Road ClosedRoadwork - Ramp Full Closure on I-894 WB at OFF RAMP TO WIS 36 SB. From 12:00 AM on 02/01/
TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road ClosedRoadwork - Mainline Full Closure on WIS 36 SB from CONNECTOR TO I-41 NB RAMP to I-41/43/89
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road ClosedClosed road from W Loomis Rd to I-41 N.
TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
I-94 Wisconsin Accident Reports Statewide (31 DOT and News Reports)