Current 93-ave Alberta Traffic Conditions
DOT Accident and Construction Reports
-
Drainage Tunnel Shaft. Summit Dr will be reduced to one lane in each direction. The sidewa
Road ClosedTYPE: Miscellaneous
-
Drainage Shaft Install. 100 Ave closed from 110 St to the first access east of 110 St with
Road ClosedTYPE: Miscellaneous
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
TYPE: Construction Low Impact
-
TYPE: Miscellaneous Low Impact
-
WLRT construction. Total closure of 144 St on the north side of Stony Plain Rd. For more i
Road ClosedTYPE: Construction Moderate
-
West LRT Construction. 107 Street, 103 Av - 104 Av SB will be closed permanantly. NB will
Road ClosedTYPE: Construction Moderate
-
West LRT Construction. 107 Street, 103 Av - 104 Av SB will be closed permanantly. NB will
Road ClosedTYPE: Construction Moderate
-
Drainage Shaft Construction. 99 Av will be closed from 150 St - 151 St for the constructio
Road ClosedTYPE: Construction Moderate