Current Hwy-38 Alberta Traffic Conditions
DOT Accident and Construction Reports
-
Roadwork from Calle El Fortín to Camino Zafiro.
Road ClosedTYPE: Construction Serious
-
Calle El Fortín Road is closed from Calle Pio XII / Calle de la Pilastra to Calle del Mol
Road ClosedTYPE: Construction Serious
-
Calle del Lago del Salado Road is closed from Avenida de las Torres to Calle San Benito de
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Serious
-
Calle Antonio I. Villarreal Road is closed from Calle Peña Guerra to Calle Raúl Murrieta
Road ClosedTYPE: Construction Moderate
-
Avenida Camino real Road is closed from Avenida Eloy Cavazos (Avenida Camino Real) to Aven
Road ClosedTYPE: Construction Moderate
-
Calle de la Hacienda Los Portales Road is closed from Avenida Guatemala to Calle Atitlán.
Road ClosedTYPE: Construction Moderate
-
Calle Acueducto Road is closed from Avenida Maestro Israel Cavazos Garza to Calle Jardíne
Road ClosedTYPE: Construction Moderate
-
Calle Luis G. Coindreau Road is closed from Avenida República Mexicana to Calle Jesús So
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Moderate
Hwy-38 AB News Reports
-
Police arrest driver following collision in Cambridge
- Alberta
- Hwy-38
- source: Bing
- 0 view
- Jun 04, 2024 05:07am
38Waterloo Regional Police have charged a 38-year-old Cambridge man with impaired driving offences after a collision in Cambridge. At around 11:40 a.m. Sunday, police responded to reports of a white GMC ... Read More
More results in our Hwy-38 Alberta Archives