1 hour ago
I-65 SB: Road cleared between 21st St and 12th St (MM 114.2, Indianapolis). https://t.co/7mu3B1WddZ
-
1 hour ago
I-65 SB: Crash between 21st St and 12th St (MM 114.2, Indianapolis). https://t.co/7mu3B1WddZ
-
1 hour ago
I-70 WB: Road cleared between Shadeland Ave and Arlington Av (MM 88.6, Indianapolis). https://t.co/1gr5j0oCXF
-
1 hour ago
IN 37 NB/SB: Major road construction at I-69 (MM 143.7, Indianapolis). https://t.co/aN5C87Yjsr
-
1 hour ago
IN 37 NB/SB: Width limit in effect from I-69 to Epler Av (MM 143.7 to MM 100.2, Indianapolis). For a long period. Construction work. Width limit 11'0". https://t.co/GvBC96Sgpt
-
2 hours ago
I-65 SB: Stalled vehicle between 21st St and 12th St (MM 114.3, Indianapolis). https://t.co/zZrD5DMuya
-
2 hours ago
IN 48: Bridge closed from IN 43 to Harmony (MM 31.1 to MM 31.8, 3m W of Bloomington). Until 11/29/2024 at 11:59PM EDT. Bridge construction, Road closed. https://t.co/w17MJhgx1j
-
2 hours ago
I-70 WB: Vehicle fire between Shadeland Ave and Arlington Av (MM 88.6, Indianapolis). https://t.co/1gr5j0oCXF
-
2 hours ago
I-69 SB: Roadwork between IN 5 and IN 18 (MM 277.4, near Landess). https://t.co/vpFk2Vy7ZY
-
2 hours ago
IN 912 SB/NB: Alternating lane closures because of construction work from 15th Av; 169th St to Ridge Rd (MM 9.1 to MM 11.7, ). Until 9/20/2024 at 6:00PM CDT. IN 912 in both directions, between 15th Av; 169th St (Gary) and Ridge Rd (Highland). here are… https://t.co/rA6d5hWVGt
-
2 hours ago
IN 156: Width limit in effect because of construction work from Hill Rd (1m N of Florence) to Goose Creek Rd (near Patriot) (MM 10.6 to MM 18, ). Until 11/22/2024 at 5:00PM EDT. Temporary traffic lights. Width limit 10'0". Temporary traffic… https://t.co/eote23SzMP
-
2 hours ago
US 41 SB: Bridge closed due to bridge construction work between Old US 41 and W 850 N (MM 188.8, 4m S of Boswell). Until 10/17/2024 at 11:59PM EDT. Bridge south bound on US 41 over Nameless Creek. Bridge deck overlay & scour protection. https://t.co/MJJ9PfzFDD
-
2 hours ago
US 30: Utility work from Taney Pl to IN 55 (MM 8.4 to MM 8.6, Merrillville). Until 9/24/2024 at 5:00PM CDT. Merrillville - Along US 30, at intersection SR 55 & US 30. Nipsco to install two (2) utility poles including the overhead equipment and conductors… https://t.co/XG6QVmwLkb
-
2 hours ago
US 231 NB/SB: Width limit in effect because of construction work from I-70 (Cloverdale) to E 700 S (1m N of Cloverdale) (MM 141.7 to MM 143.1, ). Until 12/6/2024 at 7:00AM EDT. Width limit 12'0". US 231 NB and SB lanes restricted to 12 ft. Phase… https://t.co/sCgW6MrbnW
-
2 hours ago
US 40 EB/WB: Night time construction work from Carroll Rd to Mount Comfort Rd (MM 88.7 to MM 90.7, Cumberland). Until 9/30/2024 at 6:00AM EDT. https://t.co/T0PQPScjMF
-
2 hours ago
US 20 EB: Work on the shoulder from Lewis Av to CR 18 (MM 94.1 to MM 94.5, near Dunlap). Until 9/27/2024 at 8:00AM EDT. US 20 eastbound, between CR 115 and CR 18 (near Dunlap). There is work on the shoulder. Until September 27, 2024 at about 8:00AM EDT. https://t.co/JyvvgQDndZ
-
2 hours ago
I-465 SB: Construction work at OLD US 40; US 40; W Washington St (MM 11.8, Indianapolis). Until 9/18/2024 at 6:00AM EDT. Exit ramp closed. https://t.co/j567UDOLAo
-
2 hours ago
I-465 SB: Construction work at US 136 (MM 15.5, Indianapolis). Until 9/18/2024 at 6:00AM EDT. Entrance ramp closed. https://t.co/a0kCNiRzNs
-
2 hours ago
IN 53: Gas main work from 101st Av to 93rd Av (MM 2.9 to MM 3.4, Merrillville). Until 9/19/2024 at 10:00AM CDT. Crown Point - NIPSCO crews to excavate in the right of way on state road 53. (1) 4X4 bell hole approximately 5 feet deep to excavate. 3 lanes… https://t.co/S4x1CB0OP6
-
2 hours ago
I-465 SB: Construction work at US 36 (MM 12.9, Indianapolis). Until 9/18/2024 at 6:00AM EDT. Exit ramp closed, Entrance ramp closed. https://t.co/A9NIGj6cgk