How's the traffic right now?
Hwy-2 St Albert Alberta Accident Reports
DOT Accident and Construction Reports
-
TYPE: Miscellaneous
-
TYPE: Construction Minor
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
Road ClosedWLRT construction. Total closure of 144 St on the north side of Stony Plain Rd. For more i TYPE: Construction Moderate
-
TYPE: Construction Minor
-
Road ClosedDrainage Shaft Construction. 99 Av will be closed from 150 St - 151 St for the constructio TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
Road ClosedDrainage Tunnel Shaft. Summit Dr will be reduced to one lane in each direction. The sidewa TYPE: Miscellaneous Moderate
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
Road ClosedWest LRT Construction. 107 Street, 103 Av - 104 Av SB will be closed permanantly. NB will TYPE: Construction Moderate
-
Road ClosedDrainage Shaft Install. 100 Ave closed from 110 St to the first access east of 110 St with TYPE: Miscellaneous Moderate