How's the traffic right now?
I-279 Ohio Township Pennsylvania Accident Reports
I-279 Ohio Township Pennsylvania Live Traffic Cams
DOT Accident and Construction Reports
-
Road ClosedRoadwork on CAMP MEETING DUFF CITY RD / BIG SEWICKLEY CREEK RD / RED MUD HOLLOW RD / MAGEE TYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
Road ClosedDamaged roadway on LOCUST ST / ROOSEVELT RD both directions between EICHER RD and GREENVIS TYPE: Road Hazard Moderate
-
TYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road ClosedDamaged roadway on WAY HOLLOW RD both directions between CREEK DR, WOODLAND RD and BACKBON TYPE: Road Hazard Moderate
-
TYPE: Construction Moderate
-
Road ClosedUS-19 N / Perry Hwy Road is closed from Rochester Rd (Perry Hwy/US-19) to Three Degree Rd TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Accident Serious
-
Road ClosedRoadwork from exit [56] to McClaren Rd. TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious