How's the traffic right now?
US 1 Feasterville Pennsylvania Accident Reports
DOT Accident and Construction Reports
-
TYPE: Accident Serious
-
TYPE: Accident Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road ClosedRoadwork on PA 63 eastbound 0 miles EAST of Exit: THORNTON ROAD. There is a ramp closure. TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
Road ClosedPA-213 / W Maple Ave Road is closed from E Bristol Rd (Bridgetown Pike/PA-213) to PA-413/P TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road ClosedS Bellevue Ave Road is closed from E Richardson Ave / W Richardson Ave to N Bellevue Ave / TYPE: Miscellaneous Serious
-
Road ClosedS Bellevue Ave Road is closed from N Bellevue Ave / E Maple Ave to E Richardson Ave / W Ri TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
Road ClosedPA-213 / E Maple Ave Road is closed from PA-413/Pine St (E Maple Ave/PA-213) to Old Lincol TYPE: Miscellaneous Serious