Passing lane project begins in Meade County

U.S.-54 traffic will be reduced to one lane through the 1.5-mile-long project area. Motorists should expect delays of up to 15 minutes as flaggers and a pilot car direct one-lane traffic through the ... > react

Open the Full Article Open the Full Article - Posted 1 day ago

React to this Article

Your Name or Nickname

Your Email (will not be shown)
2 x 3 = ?

The source opens up when you press the "Open The Full Article" link above. Its content doesn't belong to us, we're not responsible for it. If you don't think this content is appropriate, or if you're the owner of the source and do not wish to have your article displayed here, please just contact us.

Latest US 54 Liberal Kansas News Reports



    • source: Bing
    • 1 view
    • Aug 06, 2024 11:07am
    US 54 Road Sign 54

    U.S.-54 traffic will be reduced to one lane through the 1.5-mile-long project area. Motorists should expect delays of up to 15 minutes as flaggers and a pilot car direct one-lane traffic through the ... Read More

    • source: Bing
    • 0 view
    • Jul 31, 2024 5:00pm
    US 54 Road Sign 54

    The ramp from Missouri Boulevard in Jefferson City to eastbound Highway 54 will be closed until mid-October, a Thursday press release from the Missouri Department of Transportation says. Read More

    • source: Bing
    • 0 view
    • Jul 17, 2024 07:47am
    US 54 Road Sign 54

    (KSNW) - Work begins next week on a new passing lane for U.S. Highway 54 in Meade County. The Kansas Department of ... expect delays of up to 15 minutes. Liberal-based J&R Sand is the contractor ... Read More

US 54 Liberal Kansas Archives More results in our US 54 Liberal Kansas Archives

US 54 Kansas News Statewide US 54 Kansas News Reports Statewide