Engineering firm to pay $52.4M in I-35W settlement

Minneapolis - An engineering firm hired to evaluate the Interstate 35W bridge before it collapsed in 2007 has ... to turn in design calculations on the bridge's integrity to the Minnesota Department ... > react

Open the Full Article Open the Full Article - Posted 3 days ago

React to this Article

Your Name or Nickname

Your Email (will not be shown)
4 x 3 = ?

The source opens up when you press the "Open The Full Article" link above. Its content doesn't belong to us, we're not responsible for it. If you don't think this content is appropriate, or if you're the owner of the source and do not wish to have your article displayed here, please just contact us.

Latest I-35w Forest Lake Minnesota News Reports



    • source: Bing
    • 4 views
    • Mar 06, 2025 3:59pm
    I-35w Road Sign35

    Minneapolis - An engineering firm hired to evaluate the Interstate 35W bridge before it collapsed in 2007 has ... to turn in design calculations on the bridge's integrity to the Minnesota Department ... Read More

I-35w Forest Lake Minnesota Archives More results in our I-35w Forest Lake Minnesota Archives

I-35w Minnesota News Statewide I-35w Minnesota News Reports Statewide