Cleared: Planned construction in Santa Rosa County on I-10 West, at Exit 22 (SR-281/Avalon Blvd). Left lane blocked. Last updated at 02:50 AM.
Cleared: Planned construction in Santa Rosa County on I-10 East, at Exit 22 (SR-281/Avalon Blvd). 2 Left lanes blocked. Last updated at 06:22 AM.
Planned construction in Santa Rosa County on I-10 East, at Exit 22 (SR-281/Avalon Blvd). 2 Left lanes blocked. Last updated at 09:39 PM. https://t.co/LrjPHDS4eH