2:19pm.. The problem with the control system of the Florida Avenue Bridge has been resolved, the roadway has re-opened, and the bridge has resumed normal operations.
Tonight 2/24, at 6:00pm, #MassDOT will hold an in person public information meeting on the Maffa Way/Mystic Avenue bridge replacements project.
Location: Schrafft's City Center, Café (1st Floor),
529 Main Street, #Charlestown
ℹ️https://t.co/3Uo1H9HKTrhttps://t.co/0nFj9GowcE