>>
Highway 16a >>
Traffic
Current Hwy-16a Traffic Conditions
Hwy-16a Traffic Delays
-
Alberta Hwy-16a
250mi From to
4 hours 6 mins travel time instead of 3 hours 41 mins
25 minutes Delay
Hwy-16a Live Traffic Cams
DOT Accident and Construction Reports
-
Roadwork from 85 Ave NW to 88 Ave NW.
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Minor
-
Drainage Install. 199 St will be totally closed to vehicle traffic South of 69 Ave between
Road ClosedTYPE: Miscellaneous Minor
-
TYPE: Miscellaneous Minor
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
Drainage Shaft Construction. 99 Av will be closed from 150 St - 151 St for the constructio
Road ClosedTYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
WLRT construction. Total closure of 144 St on the north side of Stony Plain Rd. For more i
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Minor