Current Hwy-216 Traffic Conditions

Hwy-216 Traffic Delays
-
Alberta Hwy-216
250mi From to
4 hours 6 mins travel time instead of 3 hours 41 mins
25 minutes Delay
Hwy-216 Live Traffic Cams
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
TYPE: Construction Moderate
-
Road ClosedEmergency Water Repair. Starting Feb. 27th @ 7pm 114 Ave from 170 St - 168 St will be clos
TYPE: Miscellaneous Moderate
-
Road ClosedEmergency Drainage Repair. 157 Street will be closed from 110 Ave - 109 Ave to complete an
TYPE: Construction Serious
-
Road ClosedWLRT Construction. Total closure of 151 Street on the north side of Stony Plain Road. For
TYPE: Construction Moderate
-
Road ClosedWLRT construction. Total closure of 144 St on the north side of Stony Plain Rd. For more i
TYPE: Construction Moderate
-
TYPE: Construction Minor
-
Road ClosedDrainage Shaft Construction. 99 Av will be closed from 150 St - 151 St for the constructio
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
Hwy-216 News Reports
-
Crews repair water main break in Montevallo
- Alabama
- AL-216
- source: Bing
- 4 views
- Feb 14, 2025 07:39am
A water main break has occurred in the area of Jones Road and Highway 216, causing disruptions in water service for local residents.Crews are ... Read More
More results in our Hwy-216 Archives