Hwy-616 Accident Reports
More results in our Hwy-616 Archives
DOT Accident and Construction Reports
-
TYPE: Miscellaneous
-
Roadwork from Kiriak Link SW to Koruluk Way SW.
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
Roadwork from 111 St NW to 29 Ave NW.
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
TYPE: Construction Low Impact
-
Roadwork from Range Road 234 to AB-14.
Road ClosedTYPE: Construction Moderate
-
Roadwork from 106 St NW to 51 Ave NW.
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Congestion Serious
-
Drainage Install. 199 St will be totally closed to vehicle traffic South of 69 Ave between
Road ClosedTYPE: Miscellaneous Serious
-
Drainage Shaft Installation. 97 ST, 79-80 AV northbound and southbound closed for drainage
Road ClosedTYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious