Construction Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Tue Mar 4 at 7:00 AM PST. Lane closures in both directions. Construction speed zone in effect. The SB bridge closed for repairs. All Traffic diverted onto the NB bridge. No overwidth protocols in effect up to 4.4m. Next update time Tue Mar 4 at 7:00 AM PST. Last updated Thu Feb 13 at 1:53 PM PST. (DBC-70685)
Tc-1 N / Trans Canada Hwy Nb - North Cowichan, BC
Starts at Nov 12, 2024 3:00pm Until: Mar 04, 2025 3:00pm Severity: Moderate