Construction Highway 99, in both directions. Road maintenance work between Peace Park Dr and Oak Street Bridge for 39.6 km (Vancouver to Surrey). Until Wed Jul 17 at 5:00 AM PDT. Watch for traffic control. Installing raised pavement marker reflectors in various locations. Last updated Tue Jul 9 at 1:08 PM PDT. (DBC-66030)
BC-99 SB - Richmond, BC
Starts at Jul 10, 2024 05:00am Until: Jul 17, 2024 12:00pm Severity: Serious
Tweet