Construction Highway 1A, in both directions. Utility work between 168 St and 182 St for 1.9 km (Surrey). Until Sat Jun 29. Shoulder closed. Watch for traffic control. Last updated Thu Jun 20 at 1:45 PM PDT. (DBC-65390)
Bc-1a / Fraser Hwy Nb - ,
Starts at Jun 24, 2024 07:00am Until: Jun 30, 2024 06:59am Severity: Moderate
Tweet