Construction 200 St Road is closed from 200 St to Willoughby Way / Willoughby Crt.
200 St - Langley, BC Road Closed
Starts at Jul 15, 2024 07:00am Until: Jul 18, 2024 06:59am Severity: Moderate
Langley British Columbia Live Traffic and Accident Reports
Starts at Jul 15, 2024 07:00am Until: Jul 18, 2024 06:59am Severity: Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
Just happened, but we were traveling southbound 83 and came by right after it happened. Looked bad, apparently someone was southbound and left the road at a high rate of speed crossing the 30 to 50 foot wide median and crashing into a car head on com Read More
Standstill for almost an hour. We can see the beginning of the tunnel. 2 fire engines went by about 15 minutes ago but no ambulance and no police. West bound traffic is steady flowing . Read More
Accident blocking both lanes .moving Them stop 1/2 mile Dead stop. Several CHP and other vehicles Read More
The stolen vehicle was then involved in a crash with two other vehicles a short distance away, at 200 Street and 64 Avenue ... The University of British Columbia is investigating a now-deleted ... Read More
More results in our 200 St Langley British Columbia Archives