Construction US 12 is reduced to one lane in each direction at Monte-Brady Road in Montesano with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Us-12 E / Olympic Hwy Eb - Alder Grove, WA
Starts at Jun 01, 2023 07:00am Until: Dec 31, 2025 4:00pm Severity: Moderate