Miscellaneous Drainage Shaft Installation. 97 ST, 79-80 AV northbound and southbound closed for drainage shaft installation. Pedestrian detour as per posted signage. Local access will be maintained. Detour using other routes.
97 St Nw - Edmonton, AB Road Closed
Starts at Mar 27, 2023 9:08pm Until: Dec 31, 2024 07:00am Severity: Moderate
Tweet