Construction On US 97 between milepost 298 and 299 (Riverside), Beginning Aug. 12, the road Road is closed just south of the intersection with Riverside Cutoff Rd. A local detour through Riverside on N. Mail Street/Kendall St. is in place 24 hours a day. Road Road is scheduled to reopen Aug 31. A contractor is replacing four undersized culverts with appropriately sized precast concrete box culverts. Contact: NCR Communications 509-667-2815
Us-97 S / Wa-20 / US Highway 97 Sb - Riverside, WA Road Closed
Starts at Aug 12, 2024 04:30am Until: Sep 01, 2024 04:30am Severity: Serious
Tweet