Construction Both directions milepost 136 to 138 over the Vantage Bridge. Monday, Aug. 5 at 5 a.m. until Friday, Aug. 9 at 8 p.m. there will be 24-hour single-lane closures with a speed reduction and 10-ft width restriction for bridge work. The eastbound width restriction begins at Exit 110, the junction of I-82, near Ellensburg.
I-90 E - Kittitas, WA
Starts at Aug 05, 2024 07:00am Until: Aug 10, 2024 03:00am Severity: Serious
Tweet