Construction Lane closure due to Bridge Work between Eastside Bypass and Eastside Bypass
CA-152 / STATE HIGHWAY 152 EB - Dos Palos, CA
Starts at Apr 16, 2024 2:01pm Until: Dec 31, 2024 10:59pm Severity: Moderate
TweetDos Palos California Live Traffic and Accident Reports
Starts at Apr 16, 2024 2:01pm Until: Dec 31, 2024 10:59pm Severity: Moderate
TweetTYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
Construction on I70 median at about mile 81. Traffic backed up for miles, both directions. Read More
Bumper to bumper Read More
More results in our CA-152 / STATE HIGHWAY 152 EB Dos Palos California Archives