Construction Nelson St Road is closed from Jeffrey St to Height St.
1215 Jeffrey St - College Heights, CA Road Closed
Starts at Nov 19, 2024 08:00am Until: Nov 22, 2024 07:59am Severity: Moderate
TweetCollege Heights California Live Traffic and Accident Reports
Starts at Nov 19, 2024 08:00am Until: Nov 22, 2024 07:59am Severity: Moderate
TweetTYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Accident Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
Very slow moving traffic for at least 4 miles Read More
Clean up of some spill diverting all traffic to service roads Read More
One vehicle looks headed East off road on N side of roadway. Fairly heavy front end damage, black mid to large size suv. Fire truck and emergency ambulance vehicles on site. could not discern status of person (s) injuries or not. Read More
there was a chopper landing ahead of us at first when traffic was a total stop, it opened 1 lane eventually and there was some kind of crazy wreck in the ditch to the side of the right lane. multiple tow trucks, crains, bobcats, and the flipin hazmat Read More
More results in our 1215 Jeffrey St College Heights California Archives