Construction Structure work will be starting on 5/30/24 for a bridge deck overlay and guardrail updating. Traffic will have reduced speeds and be reduced to one lane, with traffic signals directing the traffic flow while work is taking place. A width restriction of 12.0 feet is in place while work is on going.
163 Highway 8 S - Hettinger, ND
Starts at May 31, 2024 05:00am Until: Jul 31, 2024 05:00am Severity: Minor
Tweet