Construction Between CO 7 and CO 7 (Allenspark) from Mile Point 9.74 to Mile Point 19.25. Striping operations. Starting July 26, 2024 at 6:30AM MDT until July 26, 2024 at about 7:30PM MDT. Full schedule below: • July 26, 6:30AM - July 26, 7:30PM
CO-7 / STATE HIGHWAY 7 - Lyons, CO
Starts at Jul 26, 2024 12:30pm Until: Jul 27, 2024 01:30am Severity: Moderate