Construction Roadwork on US-281 S / US Highway 281 from US-281 Byp (US-281) to US-281/US-12/6th Ave (US-281).
Nw 21st St - Aberdeen, SD
Starts at May 15, 2024 11:46am Until: Jul 22, 2024 12:10pm Severity: Moderate
TweetAberdeen South Dakota Live Traffic and Accident Reports
Starts at May 15, 2024 11:46am Until: Jul 22, 2024 12:10pm Severity: Moderate
TweetTYPE: Construction Moderate
Just happened, but we were traveling southbound 83 and came by right after it happened. Looked bad, apparently someone was southbound and left the road at a high rate of speed crossing the 30 to 50 foot wide median and crashing into a car head on com Read More
Standstill for almost an hour. We can see the beginning of the tunnel. 2 fire engines went by about 15 minutes ago but no ambulance and no police. West bound traffic is steady flowing . Read More
Accident blocking both lanes .moving Them stop 1/2 mile Dead stop. Several CHP and other vehicles Read More
Central Time June 23, amid the heatwave, torrential rain and flooding plaguing the Midwest in recent days, the center span of BNSF's Aberdeen Subdivision bridge over the Big ... Read More
More results in our Nw 21st St Aberdeen South Dakota Archives