Construction Roadwork at exit [48].
- Sidney, NE
Starts at Apr 24, 2023 12:00pm Until: Jul 04, 2027 2:33pm Severity: Moderate
TweetStarts at Apr 24, 2023 12:00pm Until: Jul 04, 2027 2:33pm Severity: Moderate
TweetI-80 WB: Bridge repair from Exit 102 - I-76; North 14th Street; Sidney to Exit 101 - US 138; Big Springs;Julesburg (24m W of Ogallala exit). Right lane closed. https://t.co/yYiP954qCC
I-80 WB: Road maintenance operations from MM 8 to MM 2 (51 to 53m W of Sidney). Right lane closed. https://t.co/wk69sBkw9t
TYPE: Construction Moderate
TYPE: Construction Low Impact
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Moderate
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
TYPE: Construction Serious
Construction on I70 median at about mile 81. Traffic backed up for miles, both directions. Read More
Bumper to bumper Read More
The Nebraska Department of Transportation (NDOT) plans to close the railroad crossing north of the Highway 14 and Highway 30 intersection, replacing it with a viaduct to ease traffic congestion caused ... Read More
The Nebraska Department of Transportation reported the crash at 5 p.m. Authorities say both directions of Highway 30 were closed about 8 miles northwest of Fremont between county ... Read More
-10:41 a.m.: crime in progress. Dylan M. Valentine, 33, of Sidney, was arrested for domestic violence. -6:14 p.m.: crash. An unknown vehicle struck the parked vehicle belonging to Greg Doseck, of ... Read More
More results in our Sidney Nebraska Archives