Construction Roadwork on US-12 W / Main St from SD-109 (US-12) to 482nd Ave (US-12).
48659 Main St - Big Stone City, SD
Starts at Jun 26, 2024 9:32pm Until: Jul 04, 2024 9:50pm Severity: Moderate
Big Stone City South Dakota Live Traffic and Accident Reports
Starts at Jun 26, 2024 9:32pm Until: Jul 04, 2024 9:50pm Severity: Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
Accident ahead north of Sagle. Traffic stopped in both directions Read More
Car rolled over onto its side in the north bound lane Read More
Accident 41 and Lutz Lake Fern rd Read More
A wreckless driver, possibly a drunk guy in a Blue Navy Chevy Equinox SC tag 559 AID is driving wrecklessly up and down, and in the middle of Rowley Street DT Greenville . He is also harassing women walking in the street. The guy is a dark headed Ca Read More
A wreckless driver, possibly a drunk guy in a Blue Navy Chevy Equinox SC tag 559 AID is driving wrecklessly up and down, and in the middle of Rowley Street DT Greenville . He is also harassing women walking in the street. The guy is a dark headed Ca Read More
Did you know that June 20 and June 21, 2024, is the wettest two-day period on record in Mitchell history? That's according to the National Weather Service, which measured the two-day total at 7.7 ... Read More
but also the health of the Big Sioux River. Mayor Paul TenHaken signed an executive order to issue an emergency declaration Saturday after days of persistent precipitation inundated the city, along ... Read More
More results in our 48659 Main St Big Stone City South Dakota Archives