Construction Roadwork from Zane St NW to Highway 169.
18033 Zane St Nw - Elk River, MN Road Closed
Starts at Aug 23, 2024 2:59pm Until: Aug 31, 2024 04:59am Severity: Moderate
TweetElk River Minnesota Live Traffic and Accident Reports
Starts at Aug 23, 2024 2:59pm Until: Aug 31, 2024 04:59am Severity: Moderate
TweetTYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Serious
TYPE: Accident Serious
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
Bad car accident Read More
Between Westfield and Worcester ( east and westbound) there are about 18sections of ( BUMP) signs that appear to be there to stay. Why those sections cant be paved with the rest remains a mystery to me. Save your front end, be aware. Massachusetts Read More
Standstill traffic Read More
The Minnesota State Patrol says the incident happened on Highway 169 in Elk River at about 5:45 a.m. Wednesday. Both a car and the motorcycle were southbound when they collided. Thirty-five-year-old ... Read More
Elk River freeway: 2022-2024 constructionWork zone changes Aug. 12-29Week of Mon, Aug. 12Crews will pave east of the Hwy 169 bridge, includes northbound Hwy ... Read More
One of the drivers involved in a fatal Elk River crash earlier this month is ... to a crash at 3:39 p.m. on July 19 on U.S. Highway 10. An eastbound black SUV on Highway 10 collided with a Kia ... Read More
Elk River freeway: 2022-2024 constructionWork zone changes Aug. 12-29Week of Mon, Aug. 12Crews will pave east of the Hwy 169 bridge, includes northbound Hwy ... Read More
A 24-year-old Dayton man was cited, according to Elk River Police Capt. Joe Gacke. Read More
More results in our 18033 Zane St Nw Elk River Minnesota Archives