Construction Lanes closed to traffic, detour in place. Motorists should expect delays. For the rehabilitation and reconstruction of existing roadway. Consisting of milling SMA/HMA, full-depth reconstruction of sidewalks, curb ramps, signing and striping, drainage structures, illumination and traffic signals.
Us-62 W / Tx-114 / 19th St Wb - Slaton-bean, TX
Starts at Mar 25, 2024 9:26pm Until: Dec 02, 2025 05:00am Severity: Moderate