Construction Left lane closed. Ih-345 NB left lane closed from Louise Ave to Ross Ave on June 9 through June 11 from 9PM to 5AM, weather permitting.
Us-75 S - Downtown Dallas, TX
Starts at Jun 10, 2024 07:00am Until: Jun 11, 2024 3:00pm Severity: Serious
Tweet