Construction Roadwork on Waterdown Rd from ON-403 (RR-26) to Mountain Brow Rd (RR-26).
Waterdown Rd - Burlington, ON
Starts at Jul 18, 2024 8:12pm Until: Jul 19, 2024 06:10am Severity: Moderate
TweetBurlington Ontario Live Traffic and Accident Reports
Starts at Jul 18, 2024 8:12pm Until: Jul 19, 2024 06:10am Severity: Moderate
TweetTYPE: Construction Moderate
Just happened, but we were traveling southbound 83 and came by right after it happened. Looked bad, apparently someone was southbound and left the road at a high rate of speed crossing the 30 to 50 foot wide median and crashing into a car head on com Read More
Standstill for almost an hour. We can see the beginning of the tunnel. 2 fire engines went by about 15 minutes ago but no ambulance and no police. West bound traffic is steady flowing . Read More
Accident blocking both lanes .moving Them stop 1/2 mile Dead stop. Several CHP and other vehicles Read More
Pop-up thunderstorms in the middle of summer don't always last for very long, but sometimes they can last for hours, turning an average storm into a flash flood. This is what happened in London, Ont., ... Read More
More results in our Waterdown Rd Burlington Ontario Archives