Construction IN-3 / N State Highway 3 Road is closed from IN-750 (IN-3) to W Main St (IN-3).
IN-3 / N STATE HIGHWAY 3 - North Vernon, IN Road Closed
Starts at May 06, 2024 11:00am Until: Nov 04, 2024 12:00pm Severity: Moderate
North Vernon Indiana Live Traffic and Accident Reports
Starts at May 06, 2024 11:00am Until: Nov 04, 2024 12:00pm Severity: Moderate
TYPE: Construction Moderate
TYPE: Construction Moderate
Just happened, but we were traveling southbound 83 and came by right after it happened. Looked bad, apparently someone was southbound and left the road at a high rate of speed crossing the 30 to 50 foot wide median and crashing into a car head on com Read More
Standstill for almost an hour. We can see the beginning of the tunnel. 2 fire engines went by about 15 minutes ago but no ambulance and no police. West bound traffic is steady flowing . Read More
Accident blocking both lanes .moving Them stop 1/2 mile Dead stop. Several CHP and other vehicles Read More
More results in our IN-3 / N STATE HIGHWAY 3 North Vernon Indiana Archives