Construction I-89 SB in Royalton at the bridge over the White River (after Exit 3), will be down to a single lane of travel over the bridge with a 14-foot maximum lane width. 89 NB will be utilizing the passing lane for NB traffic. Please go slow through the work zone.
I-89 S - Royalton, VT
Starts at Apr 15, 2024 2:00pm Until: Sep 01, 2028 07:00am Severity: Serious