Construction I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
I-89 S - Royalton, VT Road Closed
Starts at Apr 15, 2024 6:00pm Until: Sep 01, 2028 07:00am Severity: Serious