ERROR 404 The document you're trying to reach no longer exists.

User Reports

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam




Live Reports from the DOT's Twitter

  • Posted 22 minutes ago
    511Georgia511Georgia

    @GDOTSoutheast UPDATE: All lanes are clear

  • Posted 25 minutes ago
    WV511WV511

    Boone Co- US-119 construction on the Rock Creek Interchange Project. NB and SB left lane closures. Watch for trucks crossing roadway. Be prepared to stop.

  • Posted 25 minutes ago
    WV511WV511

    Greenbrier Co- I64-Tunnel Bridge at MP 178.75 - 179.75 beginning March 10, 2025 at 6:30am to July 1, 2025 at 8:00pm. The I64-Tunnel Bridge will be limited to the width of 12'. For bridge repairs.

  • Posted 26 minutes ago
    WV511WV511

    Ohio Co – Exit 1 on Interstate 470 will be closed to US 250/WV 2, in the eastbound direction, through mid-May 2025, for road construction.

  • Posted 26 minutes ago
    WV511WV511

    Marshall Co – A portion of US 250, from 208Dragon Highway to Hillcrest Avenue, will be restricted to one lane, from 7:00 a.m. to 5:00 p.m., beginning on Monday, March 17, 2025, through mid-May 2025, to install new water lines.

  • Posted 26 minutes ago
    WV511WV511

    Tyler Co – A portion of WV 23, from milepost 0.00 to milepost 8.75, near Shirley, will be restricted to one lane, from 7:00 a.m. to 5:30 p.m., beginning Monday,March 17, 2025, through mid-June 2025, for cable installation.

  • Posted 26 minutes ago
    WV511WV511

    Kanawha Co- I-77 northbound mile marker 109.8 to mile marker 112, Intermittent lane closures for a milling and paving project. Completion date, August 14, 2026.

  • Posted 26 minutes ago
    WV511WV511

    Jackson Co– There will be a single lane closure on Interstate 77, from milepost 132.51, to milepost 137.74, between the hours of 7:00 a.m. and 5:00 p.m., on Wednesday, March 26, 2025, through the end of the 2025 season, for a paving project.

  • Posted 27 minutes ago
    WV511WV511

    Marshall Co – A portion of WV 2 (Energy Highway), south of Moundsville, near the Kammer Plant, will have utility work over the road, from 7:30 a.m. to 5:00 p.m. beginning on Monday, April 21, 2025, through Friday, April 25, 2025, for electric line installation.

  • Posted 27 minutes ago
    WV511WV511

    Harrison Co- There will be lane closures on US 50, eastbound and westbound, at the Log Cabin Bridge, at the Marshville Road exit, from 7:00 a.m. Tuesday, April 15, through, early Nov 2026, for construction of a bridge structure. maximum lane closure widths will be 16 feet.

DOT Accident and Construction Reports

User Reports



   Archives More results in our Archives