Construction Cambridge Pkwy Road is closed from Edwin H Land Blvd to Memorial Dr/Edwin H Land Blvd.
Cambridge Pkwy - East Cambridge, MA Road Closed
Starts at Aug 01, 2024 11:12am Until: Aug 04, 2024 03:59am Severity: Serious
East Cambridge Massachusetts Live Traffic and Accident Reports
Starts at Aug 01, 2024 11:12am Until: Aug 04, 2024 03:59am Severity: Serious
TYPE: Construction Serious
Standstill traffic Read More
Sitting for 30 minutes and only moved half mile Read More
A alert sigh said crash 5 miles ahead with both right side lanes blocked Read More
Accident 40 minutes ago near Chenoa accident. Person may be deceased. Read More
Dead stop Read More
The people of East Boston are 13 days into the Sumner Tunnel shutdown. As they halt in traffic, MassDOT crews say they are 40% done with the work. Read More
CAMBRIDGE - About five months after the City of Cambridge began turning off certain downtown traffic lights and replacing them with three- and four-way stop signs, the traffic lights are officially ... Read More
More results in our Cambridge Pkwy East Cambridge Massachusetts Archives