Construction Martin Luther King Jr Ave Road is closed from US-29/Cannon Blvd (E 1st St) to US-29 Alt/Main St (W 1st St).
101 N Rose Ave - Kannapolis, NC Road Closed
Starts at Jul 23, 2024 11:54am Until: Jul 26, 2024 03:59am Severity: Serious
Kannapolis North Carolina Live Traffic and Accident Reports
Starts at Jul 23, 2024 11:54am Until: Jul 26, 2024 03:59am Severity: Serious
TYPE: Construction Serious
TYPE: Construction Moderate
TYPE: Miscellaneous Moderate
TYPE: Miscellaneous Moderate
TYPE: Construction Serious
TYPE: Accident Serious
TYPE: Miscellaneous Serious
TYPE: Miscellaneous Serious
Traffic standstill since 4:10 am. Read More
Sign said accident 9 miles ahead Read More
Just happened, but we were traveling southbound 83 and came by right after it happened. Looked bad, apparently someone was southbound and left the road at a high rate of speed crossing the 30 to 50 foot wide median and crashing into a car head on com Read More
Love the 3.5 six engine, the ability to manually shift and the overall solid feel on the highway or dirt country roads. Looks like I'm a Toyota Tacoma fan member. Anyone want to buy a perfect and ... Read More
8-Year-Old Dies After Being Left in Hot Car by Mother, North Carolina Police Say A woman ... according to the National Highway Traffic Safety Administration. The administration recommends leaving ... Read More
More results in our 101 N Rose Ave Kannapolis North Carolina Archives