-
3 days ago
On 3/26, at 7:00pm, #MassDOT will hold a public information meeting for the Chelmsford-Lowell Bridge Replacement Project, Westford Street over I-495 in Chelmsford and Route 3A (Gorham Street) over I-495 on the Chelmsford-Lowell line.
ℹ️ https://t.co/xly4FSAnPc https://t.co/UxCEU4zgeq
-
3 days ago
Tonight 3/20, at 7:00pm, #MassDOT will hold a design public hearing to discuss the proposed Bridge Replacement, Maple Street over I-496 project in #Bellingham.
ℹ️ https://t.co/k01zRAChhj https://t.co/iX4EAo7mMp
-
3 days ago
Tonight 3/20, at 7:00pm, #MassDOT will hold a design public hearing to discuss the proposed Bridge Replacement, Maple Street over I-496 project in #Bellingham.
ℹ️ https://t.co/k01zRACP6R https://t.co/tQXsM0K2jr
-
4 days ago
#MATraffic update - the crash on I-495 NB in #Hopkinton has cleared. All lanes open. Most of the residual delays have eased off.
-
4 days ago
#MATraffic update - the crash scene on I-495 NB in #Hopkinton has been moved to the breakdown lane. All travel lanes open. Traffic is jammed most of the way back to West Main St.
-
4 days ago
#MATraffic - #Hopkinton - I-495 NB before Exit 58 (I-90/Mass Pike). A multi-vehicle crash blocking the left travel lane with traffic jammed approaching the scene.
-
6 days ago
RT @MassDOT: This week in #Middleborough Bridge Repair on I-495 over Route 105. Lane closures in place daily, Monday through Friday, 7:00 a…
-
6 days ago
This week in #Middleborough Bridge Repair on I-495 over Route 105. Lane closures in place daily, Monday through Friday, 7:00 a.m. to 3:30 p.m., until October 31. At least one lane of travel will be maintained at all times. https://t.co/hl5FKpHeqk
-
1 week ago
On 3/20, at 7:00pm, #MassDOT will hold a design public hearing to discuss the proposed Bridge Replacement, Maple Street over I-496 project in #Bellingham.
ℹ️ https://t.co/k01zRAChhj https://t.co/1H3rRCB2lc