Work on 394 between I-94 and Hwy 100 resumes at
10 p.m. Sunday. Westbound 394 traffic will be reduced to two lanes between downtown Minneapolis and Hwy 100 using the E-ZPass lanes through mid-summer. Expect delays and stay alert through the work zone. https://t.co/d9aJjviXcT