DOT Accident and Construction Reports
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Roadwork - Local Road Full Closure on - WB from Northridge Lane to Capitol Ct. From 06:00
Road ClosedTYPE: Construction Moderate
-
Roadwork - Ramp Full Closure on I-41 SB at OFF RAMP TO COUNTY CA. Daily from 03/25/2024 to
Road ClosedTYPE: Miscellaneous Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Roadwork - Local Road Full Closure on - EB from Capitol Ct to Northridge Ln. From 05:00 AM
Road ClosedTYPE: Construction Moderate
-
Roadwork - Ramp Full Closure on I-41 SB at OFF RAMP TO COUNTY BB. Daily from 03/25/2024 to
Road ClosedTYPE: Miscellaneous Moderate
-
TYPE: Miscellaneous Moderate
-
Roadwork - Local Road Full Closure on - NB from Patriot Dr to E Evergreen Dr. From 06:00 A
Road ClosedTYPE: Construction Moderate
-
- source: Bing / WISN Milwaukee on MSN
- 32 views
- Jun 12, 2024 8:30pm
The Milwaukee County Sheriff's Office is searching for the driver of a dump truck involved in a hit-and-run crash Tuesday. The collision was caught on traffic cameras around 2:45 a.m. The dump truck ... Read More
More results in our US 45 Appleton Wisconsin Archives
All US 45 Wisconsin Traffic Cams