Current US 224 Pennsylvania Traffic Conditions
Length | 10.8mi |
Normal Travel Time | 15 mins |
Current Travel Time | 14 mins |
Expected Delay | -1 minutes |
Weather | Clouds - 25° F - 0 mph wind |
DOT Accident and Construction Reports
-
Downed utility on SAMPSON ST eastbound between LC TO HARBOR RD and LC FROM HARBOR RD. All
Road ClosedTYPE: Miscellaneous
-
Appleridge Circle Road is closed from Applewood Blvd / Kentwood Dr to Applewood Blvd / App
Road ClosedTYPE: Construction Serious
-
Appleridge Circle Road is closed from Applewood Blvd / Appleridge Dr to Applewood Blvd / K
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Roadwork on SCRUBGRASS RD / MARKET ST both directions between HOUSTON RD and MCMILLAN RD.
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
PA-68 / Virginia Ave Road is closed from Deer Ln (Virginia Ave/PA-68) to Brighton Ave (Ada
Road ClosedTYPE: Miscellaneous Serious