Current Hwy-633 St Albert Alberta Traffic Conditions
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
WLRT construction. Total closure of 144 St on the north side of Stony Plain Rd. For more i
Road ClosedTYPE: Construction Moderate
-
Drainage Shaft Construction. 99 Av will be closed from 150 St - 151 St for the constructio
Road ClosedTYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
Drainage Tunnel Shaft. Summit Dr will be reduced to one lane in each direction. The sidewa
Road ClosedTYPE: Miscellaneous Moderate
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
TYPE: Construction Moderate
-
TYPE: Construction Low Impact