Latest Accident and Construction Reports Around Merritt Pkwy Newfield-westover-turn Of River CT
Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Ca(...)
TYPE: Construction | Serious
|
Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Ex(...)
TYPE: Construction | Serious
|
Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Ex(...)
TYPE: Construction | Serious
|
Hunting Ridge Rd Road is closed from Wildwood Rd/Konandreas Dr to Old Long Ridge Rd.(...)
TYPE: Construction | Moderate | Road Closed
|
Hunting Ridge Rd Road is closed from Old Long Ridge Rd to Wildwood Rd/Konandreas Dr.(...)
TYPE: Construction | Moderate | Road Closed
|
Slow traffic on I-95 S from US-1/Exit 9 (I-95) to Harvard Ave/West Ave/Exit 6 (I-95).(...)
TYPE: Congestion | Serious
|
Slow traffic on I-95 S from Elm St/Exit 8 (I-95) to Harvard Ave/West Ave/Exit 6 (I-95).(...)
TYPE: Congestion | Serious
|
Paving operations on I-95 southbound between Exit 6 - Harvard Avenue (Stamford) and Exit 2(...)
TYPE: Construction | Serious
|
Bartlett Ave Road is closed from Silvermine Ave to Hillwood Pl.(...)
TYPE: Miscellaneous | Serious | Road Closed
|
s
Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk)(...)
TYPE: Construction | Serious
|
Flax Hill Rd Road is closed from Scribner Ave to Washington St/Fairfield Ave.(...)
TYPE: Miscellaneous | Serious | Road Closed
|
Flax Hill Rd Road is closed from Washington St/Fairfield Ave to Scribner Ave.(...)
TYPE: Miscellaneous | Serious | Road Closed
|
Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk)(...)
TYPE: Construction | Serious
|
Installation of traffic management systems and installation of traffic monitoring systems (...)
TYPE: Construction | Moderate
|
Maple St Road is closed from US Highway 7 to West Ave / Orchard St.(...)
TYPE: Miscellaneous | Moderate | Road Closed
|
W Rocks Rd Road is closed from Aiken St to Ward St/Cannon St.(...)
TYPE: Miscellaneous | Moderate | Road Closed
|
George Ave Road is closed from Lockwood Ln to Bettswood Rd.(...)
TYPE: Miscellaneous | Moderate | Road Closed
|
George Ave Road is closed from Clearview Ave to Lockwood Ln.(...)
TYPE: Miscellaneous | Moderate | Road Closed
|
Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) an(...)
TYPE: Construction | Serious
|
Bridge Hit and Ramp Closure on Hutchinson River Parkway [Westchester] northbound ramp to E(...)
TYPE: Construction | Serious | Road Closed
|
Paving operations on I-95 northbound between Exit 2 - Delavan Avenue (Greenwich) and Exit (...)
TYPE: Construction | Serious
|
US-1 S / N Main St Road is closed from US-1/Main St (US-1) to Mill St (US-1).(...)
TYPE: Miscellaneous | Serious | Road Closed
|
Latest Newfield-westover-turn Of River Connecticut Merritt Pkwy Traffic Report From The News
No news clip matched your search criteras.
Click here to search our Connecticut Merritt Pkwy Archives
You could also use our search engine Below to find what you're looking for
Click here to search our Connecticut Merritt Pkwy Archives
You could also use our search engine Below to find what you're looking for