Current US 19 Cleveland Street District Florida Traffic Conditions
DOT Accident and Construction Reports
-
S Fort Harrison Ave Road is closed from Court St (US-19 Alt) to Chestnut St (US-19 Alt).
Road ClosedTYPE: Construction Serious
-
S Fort Harrison Ave Road is closed from Chestnut St (US-19 Alt) to Court St (US-19 Alt).
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
Roadworks scheduled 08/30/2024 - 08/31/2024
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Roadworks scheduled 08/20/2024 - 08/27/2024
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Moderate
-
Roadworks scheduled 01/05/2021 - 31/10/2024
Road ClosedTYPE: Construction Moderate
-
Roadworks scheduled 05/01/2021 - 10/31/2024
Road ClosedTYPE: Construction Moderate
More results in our US 19 Cleveland Street District Florida Archives
Older Cleveland Street District Route 19 FL User Reports
-
Accident on U.s 19
- Tarpon Springs
- Florida
- U.s 19
- By Anonymous
- 344
- 1 year ago
Accident on us 19 heading. Be advised all traffic is almost at a stand still. 2 cars off the side of the road. Fire truck on the right hand side of the road. Right lane is blocked. Read More
-
Accident on I-95 S
- West Melbourne
- Florida
- I-95 S
- 1
- By Anonymous
- 353
- 1 year ago
2 vehicle accident blocking left lane just south of US 192 exit Read More