Latest Accident and Construction Reports Around W Redford MI
Stationary traffic on Plymouth Rd from Middlebelt Rd to Merriman Rd.(...)
TYPE: Congestion | Serious
|
Roadwork on Penrod St from Joy Rd to Van Buren St.(...)
TYPE: Construction | Serious
|
Stationary traffic on M-39 S from Plymouth Rd/Exit 10 (MI-39) to Michigan Ave/Exit 6 (MI-3(...)
TYPE: Congestion | Serious
|
Roadwork from Westland to Merriman Rd.(...)
TYPE: Construction | Serious | Road Closed
|
Roadwork from Merriman Rd to Westland.(...)
TYPE: Construction | Serious | Road Closed
|
SB US-24 (Telegraph) ramp to WB M-102 (8 Mile Rd) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
Biltmore St Road is closed from Pilgrim St to Puritan St.(...)
TYPE: Construction | Serious | Road Closed
|
NB US-24 (Telegraph) ramp to EB M-102 (8 Mile Rd) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
SB US-24 (Telegraph) ramp to EB M-102 (8 Mile Rd) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
s
EB I-96 Express (Edward J Jeffries Freeway) from Greenfield Rd to Schaefer Hwy left and ri(...)
TYPE: Construction | Serious
|
EB M-102 (8 Mile Rd) ramp to SB US-24 (Telgraph) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
Stationary traffic on M-39 S from Warren Ave/Exit 8 (MI-39) to Michigan Ave/Exit 6 (MI-39)(...)
TYPE: Congestion | Serious
|
EB M-102 (8 Mile Rd) ramp to NB US-24 (Telegraph) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
WB M-102 (8 Mile Rd) ramp to SB US-24 (Telgraph) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
NB US-24 (Telegraph) ramp to WB M-102 (8 Mile Rd) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
WB M-102 (8 Mile Rd) ramp to NB US-24 (Telegraph) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
SB US-24 (Telegraph) from 9 Mile Rd to M-5/Grand River two lanes closed for construction(...)
TYPE: Construction | Moderate
|
SB M-39 (Southfield Fwy) from M-153 to I-94 lane closed for construction(...)
TYPE: Construction | Serious
|
SB M-39 (Southfield Fwy) from M-153 to I-94 two lanes closed for construction(...)
TYPE: Construction | Serious
|
Grove St Road is closed from Winthrop St to Greenfield Rd.(...)
TYPE: Construction | Serious | Road Closed
|
Grove St Road is closed from Greenfield Rd to Winthrop St.(...)
TYPE: Construction | Serious | Road Closed
|
EB I-96 Local (Edward J Jeffries Freeway) ramp to M-5 (Grand River Ave)/Schaefer closed fo(...)
TYPE: Construction | Serious | Road Closed
|
Roadwork on Oakwood Blvd from Rotunda Dr to US-12/Michigan Ave.(...)
TYPE: Construction | Serious
|
Stationary traffic on Southfield Fwy from Hubbard Dr (MI-39 Frontage) to MI-39/Rotunda Dr/(...)
TYPE: Construction | Serious
|
Stationary traffic on M-153 / Ford Rd from Farmington Rd (Ford Rd/MI-153) to N Wayne Rd (F(...)
TYPE: Congestion | Serious
|
WB I-96 at Levan(...)
TYPE: Accident | Serious
|
EB US-12 (Michigan Ave) ramp to SB M-39 (Southfield Fwy) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
WB US-12 (Michigan Ave) ramp to SB M-39 (Southfield Fwy) closed for construction(...)
TYPE: Construction | Serious | Road Closed
|
NB M-39 (Southfield Fwy) from Outer Dr to M-153 (Ford Rd) left lane closed for maintenance(...)
TYPE: Construction | Serious
|
Stationary traffic on M-153 / Ford Rd from N Wildwood St (Ford Rd/MI-153) to N Wayne Rd (F(...)
TYPE: Congestion | Serious
|
Latest Redford Michigan W Traffic Report From The News
2 infants injured after car seats come loose during crash on I-96
michigan | i-96 |
| ||
96
|
A 25-year-old female from Redford told police that her ex-boyfriend was chasing her on the freeway causing her to drive recklessly and crash.[...]
Sep 09, 2024 1:55pm | 5 views | source: Bing / MLive
|