Current US 601 North Carolina Traffic Conditions
| Length | 135mi |
| Normal Travel Time | 2 hours 5 mins |
| Current Travel Time | 2 hours 36 mins |
| Expected Delay | 31 minutes |
DOT Accident and Construction Reports
-
Road Closed
Beginning June 16, 2025, the Pinebrook School Road bridge over I-40 will be closed for repTYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road Closed
NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross RoTYPE: Construction Serious
-
Road Closed
NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross RoTYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, the intersection of Garden VieTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Oakridge Place DrTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Orvil Lane will bTYPE: Construction Moderate

601 Mocksville Traffic
Contractor will be closing a shoulder or lane of US-601, starting southbound, for utility
76° F