Current US 119 Pennsylvania Traffic Conditions
Length | 134mi |
Normal Travel Time | 2 hours 40 mins |
Current Travel Time | 3 hours 13 mins |
Expected Delay | 33 minutes |
Weather | Rain - 36° F - 6 mph wind |
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Accident Serious
-
TYPE: Construction Serious
-
TYPE: Accident Serious
-
Roadwork on MAPLEVALE RD / VALLEY ST / JENKS ST both directions at CEMETERY RD. All lanes
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious